20.09.2010

Ground-breaking ceremony for new logistic area

On the i.xpo company site the construction works for the new logistic area (2,500 sqm) have begun. Directly behind the production halls the partially roofed area substitutes the old loading ramp. From late autumn on up to six articulate trucks can be loaded and unloaded at the same time at ground level.